|
Engineering and Design
• |
|
Performance Requirements, System Environment, and Interoperability |
|
|
|
• |
|
Feasibility Studies – Assessments |
|
|
|
• |
|
Sites Surveys and Assessments |
|
|
|
• |
|
System Design Drawings and Detailed Specifications |
|
|
|
• |
|
Configuration Management |
|
|
|
• |
|
System Architecture, Testing, and Management |
|
|
|
• |
|
Alternative Technology Assessments |
|
|
|
• |
|
Quality Assessment Oversight |
Prototyping and Testing
• |
|
Developmental Test and Evaluation (DT&E) and Operational Test and Evaluation (OT&E) Plans |
|
|
|
• |
|
Prototype Development-Build |
|
|
|
• |
|
Prototype Evaluation Plan |
|
|
|
• |
|
Prototype Test Evaluation |
|
|
|
• |
|
Database Development |
|
|
Finalize Design, Installation, and Verification
• |
|
Installation Planning |
|
|
|
• |
|
System Test Plan |
|
|
|
• |
|
Conduct Testing, Data Collection, and Analysis |
|
|
|
• |
|
Corrective Rework to Ensure Compliance with Ships’ Operational Verification Test |
|
|
|
• |
|
Software Development |
Advanced Technology Support for Ship and Shore Assets
• |
|
Telecommunications, RF, and Satellite |
|
|
|
• |
|
Sensor Systems |
|
|
|
• |
|
Advanced Power Systems |
|
|
|
• |
|
Database and Application Development, including EC/EDI |
|
|
|
• |
|
LAN / WAN Design, including Virtual Private Networks (VPN) |
|
|

USCG Bay Area Communications System in Mount Diablo, CA

MTD Rack Elevation
|
|